https://pdl-group.com/wp-content/uploads/2019/11/premium-connector4.jpg 659 2500 marc https://pdl-group.com/wp-content/uploads/2022/05/logo-reversed-300x119.png marc2019-09-10 11:12:432024-05-16 09:39:50PREMIUM CONNECTOR — ADVANCED FEA AND MAXIM® AUTOMATION TOOLS DELIVER 99.9% CERTAINTY IN 50% LESS TIMEDelivery
FILTER BY
FILTER BY
FEATURED CASE STUDIES
https://pdl-group.com/wp-content/uploads/2019/11/premium-connector4.jpg 659 2500 marc https://pdl-group.com/wp-content/uploads/2022/05/logo-reversed-300x119.png marc2019-09-10 11:12:432024-05-16 09:39:50PREMIUM CONNECTOR — ADVANCED FEA AND MAXIM® AUTOMATION TOOLS DELIVER 99.9% CERTAINTY IN 50% LESS TIME
WELL INTERVENTION TOWER - NEW ANALYSIS METHODOLOGY AND MAXIM® EXTENDS FATIGUE LIFE BY 30% & DELIVERS THE RESULTS IN 50% LESS TIME
OIL & GASEXTENDED THE FATIGUE LIFE BY 30%
REDUCED ANALYSIS TIMES BY 50%
OBTAINED CLASS APPROVAL AT THE FIRST SUBMISSION

XT FLOWLOOPS — NEW ANALYSIS METHODOLOGIES & MAXIM® AUTOMATION TOOLS DELIVER HUGE GAINS
OIL & GASREDUCED COSTS BY £100,000
EXTENDED THE FATIGUE LIFE BY 70%

PREMIUM CONNECTOR — ADVANCED FEA AND MAXIM® AUTOMATION TOOLS DELIVER 99.9% CERTAINTY IN 50% LESS TIME
OIL & GASINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

WELL INTERVENTION TOWER - NEW ANALYSIS METHODOLOGY AND MAXIM® EXTENDS FATIGUE LIFE BY 30% & DELIVERS THE RESULTS IN 50% LESS TIME
OIL & GASEXTENDED THE FATIGUE LIFE BY 30%
REDUCED ANALYSIS TIMES BY 50%
OBTAINED CLASS APPROVAL AT THE FIRST SUBMISSION
ALL CASE STUDIES

Assessment of Cable Protection Systems a Cables for Fixed Offshore Wind
OFFSHORE WIND, RENEWABLE ENERGYEQUIPMENT USED MORE EFFICIENTLY
VALIDATED MODEL PROVIDED ASSURANCE
https://pdl-group.com/wp-content/uploads/2023/02/floating-wind-mooring-chain-case-on-website-shutterstock_1302337762-scaled.jpg 1472 2560 marc https://pdl-group.com/wp-content/uploads/2022/05/logo-reversed-300x119.png marc2023-02-16 11:56:402025-02-11 12:36:45Floating Wind Mooring Chain Inclinometer Cable Structural Integrity
https://pdl-group.com/wp-content/uploads/2023/02/thermal-assessment-dynamic-case-on-website-shutterstock_2155029761-scaled.jpg 1707 2560 marc https://pdl-group.com/wp-content/uploads/2022/05/logo-reversed-300x119.png marc2023-02-16 11:56:162023-09-25 09:25:19Thermal Assessment of a Dynamic Bend Stiffener Cooling System
FRACTURE MECHANICS FINDS SAFE CYCLES FOR SUBSEA FLANGE
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

HISC ASSESSMENT TO PREVENT BRITTLE FRACTURE OF VALVE
OIL & GAS, VALVE CAPABILITYMINIMISED REVENUE LOSSES
AVOIDED UNNECESSARY INTERVENTIONS

FATIGUE ASSESSMENT FOR DESIGN-LIFE OF SUBSEA GATE VALVE
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

HPHT VALVE FOR EXTREME SUBSEA ENVIRONMENT
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

TRANSIENT RESPONSE OF SWING VALVE DUE TO FLOW INDUCED PULSATIONS
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

DETERMINATION OF VALVE FLOW COEFFICIENTS USING PARAMETRIC CFD METHODS
NUCLEAR, OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

Assessment of Cable Protection Systems a Cables for Fixed Offshore Wind
OFFSHORE WIND, RENEWABLE ENERGYEQUIPMENT USED MORE EFFICIENTLY
VALIDATED MODEL PROVIDED ASSURANCE
https://pdl-group.com/wp-content/uploads/2023/02/floating-wind-mooring-chain-case-on-website-shutterstock_1302337762-scaled.jpg 1472 2560 marc https://pdl-group.com/wp-content/uploads/2022/05/logo-reversed-300x119.png marc2023-02-16 11:56:402025-02-11 12:36:45Floating Wind Mooring Chain Inclinometer Cable Structural Integrity
https://pdl-group.com/wp-content/uploads/2023/02/thermal-assessment-dynamic-case-on-website-shutterstock_2155029761-scaled.jpg 1707 2560 marc https://pdl-group.com/wp-content/uploads/2022/05/logo-reversed-300x119.png marc2023-02-16 11:56:162023-09-25 09:25:19Thermal Assessment of a Dynamic Bend Stiffener Cooling System
FRACTURE MECHANICS FINDS SAFE CYCLES FOR SUBSEA FLANGE
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

HISC ASSESSMENT TO PREVENT BRITTLE FRACTURE OF VALVE
OIL & GAS, VALVE CAPABILITYMINIMISED REVENUE LOSSES
AVOIDED UNNECESSARY INTERVENTIONS

FATIGUE ASSESSMENT FOR DESIGN-LIFE OF SUBSEA GATE VALVE
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

HPHT VALVE FOR EXTREME SUBSEA ENVIRONMENT
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

TRANSIENT RESPONSE OF SWING VALVE DUE TO FLOW INDUCED PULSATIONS
OIL & GAS, VALVE CAPABILITYINDEPENDENTLY VERIFIED PRODUCT COMPLIANCE
REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)
PROVIDED CERTAINTY OF THE QUALIFICATION TESTING
OUR EXPERTISE DOESN’T END HERE
Our engineers are proficient in a range of advanced engineering techniques including but not limited to:
BECOME A SUCCESS STORY
These case studies are just a taste of the world leading work we do. Contact us today to find out how we can improve your existing product or help make your vision a reality.