BEPPS DIF: ENGINEERING ANALYSIS OF THE TRANSPORT BOGIE AND ASSOCIATED STRUCTURES

DESIGN CHANGES TESTED IN REAL TIME

PROJECT TIMESCALES NOW ACHIEVED

BLAST ANALYSIS REDUCES TESTING COSTS AND PROTOTYPE DEVELOPMENT

REDUCED AMOUNT OF PHYSICAL TESTING

ANALYSIS QUICKER & ALLOWED MULTIPLE ITERATIONS

CFD ANALYSIS ENSURES PROTECTION OF CRITICAL ASSETS

EQUIPMENT USED MORE EFFICIENTLY

VALIDATED MODEL PROVIDED ASSURANCE

DRY SEAL GASHOLDER AS-BUILT MODELLING USING FINITE ELEMENT ANALYSIS

MINIMISED REVENUE LOSSES

AVOIDED UNNECESSARY INTERVENTIONS

FEA ENSURES FIRST TIME PASS DURING DYNAMIC TESTING

SIGNIFICANTLY REDUCED COSTS

SIGNIFICANTLY SHORTENED TIMESCALES

FEA IMPROVES PERFORMANCE AND REDUCES DEVELOPMENT TIME

SAVINGS ON PROTOTYPES & TESTING

IDENTIFIED OPTIMAL DESIGN & CRITICAL LIMITS