Posts

FRACTURE MECHANICS FINDS SAFE CYCLES FOR SUBSEA FLANGE

,

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

FATIGUE ASSESSMENT FOR DESIGN-LIFE OF SUBSEA GATE VALVE

,

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

Case Studies BEPPS DIF

BEPPS DIF: ENGINEERING ANALYSIS OF THE TRANSPORT BOGIE AND ASSOCIATED STRUCTURES

DESIGN CHANGES TESTED IN REAL TIME

PROJECT TIMESCALES NOW ACHIEVED

Case Studies - Blast Analysis

BLAST ANALYSIS REDUCES TESTING COSTS AND PROTOTYPE DEVELOPMENT

REDUCED AMOUNT OF PHYSICAL TESTING

ANALYSIS QUICKER & ALLOWED MULTIPLE ITERATIONS

Case Studies - Dry Seal Gas Holder

DRY SEAL GASHOLDER AS-BUILT MODELLING USING FINITE ELEMENT ANALYSIS

MINIMISED REVENUE LOSSES

AVOIDED UNNECESSARY INTERVENTIONS

A stock image of a butterfly valve

FEA ENSURES FIRST TIME PASS DURING DYNAMIC TESTING

SIGNIFICANTLY REDUCED COSTS

SIGNIFICANTLY SHORTENED TIMESCALES

Case Studies - FEA Transport

FEA IMPROVES PERFORMANCE AND REDUCES DEVELOPMENT TIME

SAVINGS ON PROTOTYPES & TESTING

IDENTIFIED OPTIMAL DESIGN & CRITICAL LIMITS