PDL Stock Image Submarine

DELIVERY
WITHOUT
DOUBT

DELIVERY
WITHOUT
DOUBT

JOIN OVER 1,500 SUCCESSFULLY COMPLETED PROJECTS

JOIN OVER 1,500 SUCCESSFULLY COMPLETED PROJECTS

FEATURED CASE STUDIES

Picture of a Premium Connector

PREMIUM CONNECTOR – AUTOMATION DELIVERS 99.9% CERTAINTY IN 50% LESS TIME

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

Picture of Well Intervention Tower

WELL INTERVENTION TOWER - NEW ANALYSIS METHODOLOGY EXTENDS FATIGUE LIFE BY 30%

EXTENDED THE FATIGUE LIFE BY 30%

REDUCED ANALYSIS TIMES BY 50%

OBTAINED CLASS APPROVAL AT THE FIRST SUBMISSION

Picture of a Premium Connector

PREMIUM CONNECTOR – AUTOMATION DELIVERS 99.9% CERTAINTY IN 50% LESS TIME

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

Picture of Well Intervention Tower

WELL INTERVENTION TOWER - NEW ANALYSIS METHODOLOGY EXTENDS FATIGUE LIFE BY 30%

EXTENDED THE FATIGUE LIFE BY 30%

REDUCED ANALYSIS TIMES BY 50%

OBTAINED CLASS APPROVAL AT THE FIRST SUBMISSION

ALL CASE STUDIES

Optioneering Image

OPTIONEERING FOR ILW ENCAPSULATION, BERKELEY CAESIUM REMOVAL PLANT

REDUCTION IN PROCESSING COSTS

MASSIVELY REDUCED TIMESCALES

PDL Stock Image

ANCHORSHOLME OUTFALL – COMBINED CFD & ORCAFLEX REDUCE RISK AND COST

ACCURATE PREDICTION OF PIPELINE LOAD

REDUCED RISK OF PIPES BEING DAMAGED

Picture of Caesar-ii-4

PDL CAESAR II EXPERTISE PREVENTS FAILURE OF GRP VENTILATION

STOPPED ALL MINOR REPAIR WORK

INCREASED PERFORMANCE

Picture of a Premium Connector

PREMIUM CONNECTOR – AUTOMATION DELIVERS 99.9% CERTAINTY IN 50% LESS TIME

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

Optioneering Image

OPTIONEERING FOR ILW ENCAPSULATION, BERKELEY CAESIUM REMOVAL PLANT

REDUCTION IN PROCESSING COSTS

MASSIVELY REDUCED TIMESCALES

PDL Stock Image

ANCHORSHOLME OUTFALL – COMBINED CFD & ORCAFLEX REDUCE RISK AND COST

ACCURATE PREDICTION OF PIPELINE LOAD

REDUCED RISK OF PIPES BEING DAMAGED

Picture of Caesar-ii-4

PDL CAESAR II EXPERTISE PREVENTS FAILURE OF GRP VENTILATION

STOPPED ALL MINOR REPAIR WORK

INCREASED PERFORMANCE

Picture of a Premium Connector

PREMIUM CONNECTOR – AUTOMATION DELIVERS 99.9% CERTAINTY IN 50% LESS TIME

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

OUR EXPERTISE DOESN’T END HERE

Our engineers are proficient in a range of advanced engineering techniques including but not limited to:

BECOME A SUCCESS STORY

These case studies are just a taste of the world leading work we do. Contact us today to find out how we can improve your existing product or help make your vision a reality.

Call Now Button