FEATURED CASE STUDIES

PREMIUM CONNECTOR – AUTOMATION DELIVERS 99.9% CERTAINTY IN 50% LESS TIME

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

WELL INTERVENTION TOWER - NEW ANALYSIS METHODOLOGY EXTENDS FATIGUE LIFE BY 30%

EXTENDED THE FATIGUE LIFE BY 30%

REDUCED ANALYSIS TIMES BY 50%

OBTAINED CLASS APPROVAL AT THE FIRST SUBMISSION

PREMIUM CONNECTOR – AUTOMATION DELIVERS 99.9% CERTAINTY IN 50% LESS TIME

INDEPENDENTLY VERIFIED PRODUCT COMPLIANCE

REDUCED DEVELOPMENT TIME BY 24 WEEKS (50% REDUCTION)

PROVIDED CERTAINTY OF THE QUALIFICATION TESTING

WELL INTERVENTION TOWER - NEW ANALYSIS METHODOLOGY EXTENDS FATIGUE LIFE BY 30%

EXTENDED THE FATIGUE LIFE BY 30%

REDUCED ANALYSIS TIMES BY 50%

OBTAINED CLASS APPROVAL AT THE FIRST SUBMISSION

ALL CASE STUDIES

BEPPS DIF: ENGINEERING ANALYSIS OF THE TRANSPORT BOGIE AND ASSOCIATED STRUCTURES

DESIGN CHANGES TESTED IN REAL TIME

PROJECT TIMESCALES NOW ACHIEVED

BLAST ANALYSIS REDUCES TESTING COSTS AND PROTOTYPE DEVELOPMENT

REDUCED AMOUNT OF PHYSICAL TESTING

ANALYSIS QUICKER & ALLOWED MULTIPLE ITERATIONS

CFD ANALYSIS ENSURES PROTECTION OF CRITICAL ASSETS

EQUIPMENT USED MORE EFFICIENTLY

VALIDATED MODEL PROVIDED ASSURANCE

DRY SEAL GASHOLDER AS-BUILT MODELLING USING FINITE ELEMENT ANALYSIS

MINIMISED REVENUE LOSSES

AVOIDED UNNECESSARY INTERVENTIONS

FEA ENSURES FIRST TIME PASS DURING DYNAMIC TESTING

SIGNIFICANTLY REDUCED COSTS

SIGNIFICANTLY SHORTENED TIMESCALES

FEA IMPROVES PERFORMANCE AND REDUCES DEVELOPMENT TIME

SAVINGS ON PROTOTYPES & TESTING

IDENTIFIED OPTIMAL DESIGN & CRITICAL LIMITS

BEPPS DIF: ENGINEERING ANALYSIS OF THE TRANSPORT BOGIE AND ASSOCIATED STRUCTURES

DESIGN CHANGES TESTED IN REAL TIME

PROJECT TIMESCALES NOW ACHIEVED

BLAST ANALYSIS REDUCES TESTING COSTS AND PROTOTYPE DEVELOPMENT

REDUCED AMOUNT OF PHYSICAL TESTING

ANALYSIS QUICKER & ALLOWED MULTIPLE ITERATIONS

CFD ANALYSIS ENSURES PROTECTION OF CRITICAL ASSETS

EQUIPMENT USED MORE EFFICIENTLY

VALIDATED MODEL PROVIDED ASSURANCE

DRY SEAL GASHOLDER AS-BUILT MODELLING USING FINITE ELEMENT ANALYSIS

MINIMISED REVENUE LOSSES

AVOIDED UNNECESSARY INTERVENTIONS

FEA ENSURES FIRST TIME PASS DURING DYNAMIC TESTING

SIGNIFICANTLY REDUCED COSTS

SIGNIFICANTLY SHORTENED TIMESCALES

FEA IMPROVES PERFORMANCE AND REDUCES DEVELOPMENT TIME

SAVINGS ON PROTOTYPES & TESTING

IDENTIFIED OPTIMAL DESIGN & CRITICAL LIMITS

OUR EXPERTISE DOESN’T END HERE

Our engineers are proficient in a range of advanced engineering techniques including but not limited to:

BECOME A SUCCESS STORY

These case studies are just a taste of the world leading work we do. Contact us today to find out how we can improve your existing product or help make your vision a reality.

Call Now Button